| Material | PE PP PS PVC ABS Lumps |
|---|---|
| Color | Custom-made |
| Power Supply | 380V/3Phase/50Hz Or Custom-made |
| Blade Shaft | Single |
| Blade Material | SKD-11 |
| Material | PP Woven Bags, PE Films |
|---|---|
| Warranty | 12 Months |
| Function | Cutting Compaction And Granulating Machine |
| Color | Custom-made |
| Condition | New |
| Material | PE Films |
|---|---|
| Color | Custom-made |
| Volt | 380V/3Phase/50Hz Or Custom-made |
| Warranty | 12 Months |
| Final Moisture | About 1% |
| Color | Custom-made |
|---|---|
| Shaft | Double Shafts |
| Warranty | 12 Months |
| Voltage | 380V/3Phase/50Hz Or Custom-made |
| Materials | Waste Plastic Films, Garbage Films, Woven Bags, Ton Bags |
| Material | PE Films, PP Woven Bags, PP Films, PP Jumbo Bags |
|---|---|
| Color | Custom-made |
| Power Supply | 380V/3Phase/50Hz Or Custom-made |
| Blade Shaft | Single |
| Blade Material | SKD-11 |
| Material | PE PP PS PVC ABS Lumps |
|---|---|
| Color | Custom-made |
| Power Supply | 380V/3Phase/50Hz Or Custom-made |
| Blade Shaft | Single |
| Blade Material | SKD-11 |
| Shaft Design | Double Shaft |
|---|---|
| After-sales Service Provided | Engineers Available To Service Machinery Overseas |
| Voltage | 380V 50HZ 3PHASE Or Customized |
| Warranty | 1year |
| Application | Shredding Large Volume Materials, Such As Car Shells, Tires, Metal Barrels, Scrap Aluminum, Scrap Steel, Household Garbage, Hazardous Waste, Industrial Garbage |
| Voltage | 380V 50HZ |
|---|---|
| Condition | New |
| Certificate | CE,ISO9001 |
| WeFinal Product Ight | PET Pellets |
| Application | Granules,Pipe |
| Applied For | PET Chips/ PET Recycled Flake |
|---|---|
| Processing | Feeding--Drying And Crystallization---Discharging |
| Drying Time | 20mins (can Be Adjustable By Moisture Need) |
| Power Consumpron | Only 45% Of Conventional Dehumidifier |
| Heater | Infrared Lamps |
| Used For | Crystallization Of PET Pellets/ Chips, PET Sheet Scrap, PET Flake |
|---|---|
| Output | 100kg/h To 1000kg/h |
| Heating Way | Infrared Lamps |
| Crystallization Time | 15-20mins |
| Temperature | Can Be Adjustable By Material Need |